Mechanical Engineering MCQs prepared for job test and interview preparation, especially for fresh graduates, students, and candidates appearing in competitive exams. These multiple-choice questions cover key topics such as Machine Design, Theory of Machines, Hydraulic Machines, and other important mechanical engineering concepts.

According to Rowan plan, if H = hourly rate, A = actual time and S = standard time, then wages will be___________________?
A HA
B HA + (S~A) HA
C HA + ^^-H
D HA + ^^-H
Correct Answer: HA
In A-B-C control policy, maximum attention is given to__________________?
A those items which consume money
B those items which are not readily available
C those x items which are in more demand
D those items which consume more money
Correct Answer: those items which consume more money
The mathematical technique for finding the best use of limited resources in an optimum manner is known as___________________?
A operation research
B linear programming
C network analysis
D queuing theory
Correct Answer: linear programming
The two-bin system is concerned with_________________?
A ordering procedure
B forecasting sales
C production planning
D despatching and expediting
Correct Answer: ordering procedure
Which of the following depreciation system ensures that the interest be charged on the cost of machine asset every year on the book value, but the rate of depreciation every year remains constant_____________________?
A sinking fund method
B straight line method
C A-B-C charging method
D annuity charging method
Correct Answer: annuity charging method
Bin card is used in__________________?
A administrative wing
B workshop
C foundry shop
D stores
Correct Answer: stores
CPM is the___________________?
A time oriented technique
B event oriented technique
C activity oriented technique
D target oriented technique
Correct Answer: activity oriented technique
Work study comprises following main techniques_________________?
A method study and work measurement
B method study and time study
C time study and work measurement
D method study and job evaluation
Correct Answer: method study and work measurement
PERT is the__________________?
A time oriented technique
B event oriented technique
C activity oriented technique
D target oriented technique
Correct Answer: event oriented technique
PERT stands for k (fit) project evaluation and review technique__________________?
A project examination and review technique
B project evaluation and reporting technique
C process execution and reporting technology
D project execution and results technique
Correct Answer: project examination and review technique