M C Q s D r i v e

Mechanical Engineering Mcqs 1919 MCQs [All-Courses]

thumb

Mechanical Engineering MCQs prepared for job test and interview preparation, especially for fresh graduates, students, and candidates appearing in competitive exams. These multiple-choice questions cover key topics such as Machine Design, Theory of Machines, Hydraulic Machines, and other important mechanical engineering concepts.

Job evaluation is the method-of determining the________________?
A relative worth of jobs
B skills required by a worker
C contribution of a worker
D contribution of a job
Correct Answer: relative worth of jobs
Expediting function consists in keeping a watch on__________________?
A operator’s activity
B flow of material and in case of trouble locate source of trouble
C minimising the delays
D making efficient despatching
Correct Answer: flow of material and in case of trouble locate source of trouble
Work study is done with the help of_______________?
A process chart
B material handling
C stop watch
D all of the above
Correct Answer: stop watch
Micromotion study involves following number of fundamental hand motions_______________?
A 8
B 12
C 16
D 20
Correct Answer: 16
Work study is most useful_______________?
A where production activities are involved
B in judging the rating of machines
C in improving industrial relations
D in judging the output of a man and improving it
Correct Answer: where production activities are involved
Material handling in automobile industry is done by_________________?
A overhead crane
B trolley
C belt conveyor
D all of the above
Correct Answer: overhead crane
What does symbol ‘D’ imply in work study ___________________?
A inspection
B transport
C delay/temporary storage
D permanent storage
Correct Answer: delay/temporary storage
Basic tool in work study is __________________?
A graph paper
B process chart
C planning chart
D stop watch
Correct Answer: stop watch
Pick up the incorrect statement from the following?
A an activity of the project is denoted by an arrow on the net work
B the tail of the arrow indicates the start of the activity
C the head of the arrow indicates the end of,the activity!
D the arrows are drawn (to scale from) left to right
Correct Answer: the arrows are drawn (to scale from) left to right
Which of the following is not wage incentive plan_________________?
A differential piece rate system
B Rowan plan
C Emerson plan
D Taylor plan
Correct Answer: Taylor plan