Mechanical Engineering MCQs prepared for job test and interview preparation, especially for fresh graduates, students, and candidates appearing in competitive exams. These multiple-choice questions cover key topics such as Machine Design, Theory of Machines, Hydraulic Machines, and other important mechanical engineering concepts.

Routing prescribes the_________________?
A flow of material in the plant
B proper utilization of man power
C proper utilization of machines
D inspection of final product
Correct Answer: flow of material in the plant
Templates are used for_________________?
A a planning layout
B flow of material
C advancing a programme in automatic machines
D copying complicated profiles
Correct Answer: a planning layout
Military organisation is known as_______________________?
A line organisation
B line and staff organisation
C functional organisation
D all of the above
Correct Answer: line organisation
The process layout is best suited where______________?
A specialisation exists
B machines are arranged according to sequence of operation
C few number of non-standardised units are to be produced
D mass production is envisaged
Correct Answer: few number of non-standardised units are to be produced
Product layout is employed for____________________?
A batch production
B continuous production
C effective utilization of machine
D all of the above
Correct Answer: continuous production
For a product layout the material handling equipment must _________________?
A have full flexibility
B employ conveyor belts, trucks, tractors etc.
C be a general purpose type
D be designed as special purpose for a particular application
Correct Answer: be designed as special purpose for a particular application
ABC analysis deals with_________________?
A analysis of process chart
B flow of material
C ordering schedule of job
D controlling inventory costs money
Correct Answer: controlling inventory costs money
One time measurement unit (TMU) in method time measurement system equals______________?
A 0.0001 minute
B 0.0006 minute
C 0.006 minute
D 0.001 minute
Correct Answer: 0.0006 minute
Time study is__________________?
A the appraisal, in terms of time, of the value of work involving human effort
B machine setting time
C time taken by workers to do a job
D method of fixing time for workers
Correct Answer: the appraisal, in terms of time, of the value of work involving human effort
Per cent idle time for men or machines is found by___________________?
A work sampling
B time study
C method study
D work study
Correct Answer: work sampling