M C Q s D r i v e

Software Engineering Mcqs 840 MCQs [All-Courses]

thumb

Software Engineering MCQs for job test and interview preparation, especially for fresh graduates, students, and candidates appearing in competitive exams. These multiple-choice questions cover a wide range of topics, including the fundamentals of software engineering, its various types, advanced concepts, software design, development processes, testing methods, software evolution, and security aspects.

SPMP stands for__________________?
A Software Project Manager’s Plan
B Software Project Management Plan
C Software Product Management Plan
D Software Product Manager’s Plan
Correct Answer: Software Project Management Plan
Which of the following is an activity that distributes estimated effort across the planned project duration by allocating the effort to specific software engineering tasks ?
A Software Macroscopic schedule
B Software Project scheduling
C Software Detailed schedule
D None of the mentioned
Correct Answer: Software Project scheduling
Which of the following is not a project factor that should be considered when planning the structure of software engineering teams ?
A The difficulty of the problem to be solved
B High frustration caused by personal, business, or technological factors that causes friction among team members
C The degree of sociability required for the project
D The rigidity of the delivery date
Correct Answer: The degree of sociability required for the project
Which type of software engineering team has a defined leader who coordinates specific tasks and secondary leaders that have responsibility for sub tasks ?
A Controlled decentralized (CD)
B Democratic decentralized (DD)
C Controlled centralized (CC)
D None of the mentioned
Correct Answer: Controlled decentralized (CD)
Who interacts with the software once it is released for production use ?
A End-users
B Client
C Project (technical) managers
D Senior managers
Correct Answer: End-users
Which of the following paradigm attempts to structure a team in a manner that achieves some of the controls associated with the closed paradigm but also much of the innovation that occurs when using the random paradigm ?
A asynchronous paradigm
B open paradigm
C closed paradigm
D synchronous paradigm
Correct Answer: open paradigm
Which paradigm structures a team loosely and depends on individual initiative of the team members ?
A random paradigm
B open paradigm
C closed paradigm
D synchronous paradigm
Correct Answer: synchronous paradigm
Which paradigm relies on the natural compartmentalization of a problem and organizes team members to work on pieces of the problem with little active communication among themselves ?
A random paradigm
B open paradigm
C closed paradigm
D synchronous paradigm
Correct Answer: closed paradigm
Which of the following is not an effective project manager trait ?
A Problem solving
B Managerial identity
C Influence and team building
D None of the mentioned
Correct Answer: None of the mentioned
Which of the following is not an approach to software cost estimation ?
A Empirical
B Heuristic
C Analytical
D Critical
Correct Answer: Critical