M C Q s D r i v e

Software Engineering Mcqs 840 MCQs [All-Courses]

thumb

Software Engineering MCQs for job test and interview preparation, especially for fresh graduates, students, and candidates appearing in competitive exams. These multiple-choice questions cover a wide range of topics, including the fundamentals of software engineering, its various types, advanced concepts, software design, development processes, testing methods, software evolution, and security aspects.

A project usually has a timeline chart which was developed by_________________?
A Henry Gantt
B Barry Boehm
C Ivar Jacabson
D None of the mentioned
Correct Answer: Henry Gantt
What is a collection of software engineering work tasks, milestones, and deliverables that must be accomplished to complete a particular project ?
A Task set
B Degree of milestone
C Adaptation criteria
D All of the mentioned
Correct Answer: Task set
Every task that is scheduled should be assigned to a specific team member is termed as_________________?
A Compartmentalization
B Defined milestones
C Defined responsibilities
D Defined outcomes
Correct Answer: Defined responsibilities
Ensuring that no more than the allocated number of people are allocated at any given time in Software Scheduling is known as ________________?
A Time Allocation
B Effort Validation
C Defined Milestone
D Effort Distribution
Correct Answer: Effort Validation
What evaluates the risk associated with the technology to be implemented as part of project scope ?
A Concept scoping
B Preliminary concept planning
C Technology risk assessment
D Customer reaction to the concept
Correct Answer: Preliminary concept planning
Which of the following is a project scheduling method that can be applied to software development ?
A PERT
B CPM
C CMM
D Both PERT and CPM
Correct Answer: PERT
What is used to determine the recommended degree of rigor with which the software process should be applied on a project ?
A Degree of Rigor
B Adaptation criteria
C Task Set
D Both degree of Rigor and adaptation criteria
Correct Answer: Adaptation criteria
A technique for performing quantitative analysis of progress is known as______________________?
A BCWS
B EVA
C BAC
D CBSE
Correct Answer: EVA
Which of the following is not an adaptation criteria for software projects ?
A Size of the project
B Customers Complaints
C Project staff
D Mission criticality
Correct Answer: Customers Complaints
Which of the following categories is part of the output of software process ?
A computer programs
B documents that describe the computer programs
C data
D all of the mentioned
Correct Answer: all of the mentioned