If the flexible budget amount is $40000 and variable overhead flexible budget variance is $25000, then actual costs incur will be ____________?
A $15,000
B $35,000
C $65,000
D $75,000
Correct Answer: $65,000
The budget, which highlights the difference between actual quantity and budgeted quantity is termed as _____________?
A actual cost budget
B flexible budget variance
C inflexible budget
D hourly budget
Correct Answer: flexible budget variance
The difference between actual variable overhead cost and flexible budget variable overhead amount is termed as __________?
A overhead flexible budget variance
B overhead fixed budget variance
C overhead flexible cost variance
D overhead flexible price variance
Correct Answer: overhead flexible budget variance
The cost allocation base used by an operating manager is classified as ____________?
A machine hours
B flexible hours
C variable hours
D fixed hours
Correct Answer: machine hours
The costing technique, which traces direct costs by multiplying price rate for producing actual outputs is known as ______________?
A constant costing
B standard costing
C unit costing
D batch costing
Correct Answer: standard costing
The flexible budget amount is added in to variable overhead flexible budget variance to calculate ____________?
A manufacturing costs incurred
B variable costs incurred
C fixed costs incurred
D actual costs incurred
Correct Answer: actual costs incurred
The depreciation on plant equipment, salaries of plant managers and plant leasing costs are considered a _____________?
A fixed batch cost
B variable batch cost
C variable overhead cost
D fixed overhead cost
Correct Answer: fixed overhead cost
The budgeting method, which incorporates an improvement anticipated in budgeting period into budget numbers, can be classified as ___________?
A anticipated budgeting
B number budgeting
C predict budgeting
D kaizen budgeting
Correct Answer: kaizen budgeting
The part of the master budget, which covers the capital expenditures, budgeted statement of cash flows and balance sheets are classified as ___________?
A financial budget
B capital budget
C cash flows budget
D balanced budget
Correct Answer: financial budget
The third step in developing operating budget is ____________?
A analysis of batches
B analysis of batches
C analysis of products
D making predictions about future
Correct Answer: making predictions about future