The practice of seller to charge higher price for same market offering is classified as __________?
A peak-load pricing
B elastic pricing
C elastic demand
D inelastic demand
Correct Answer: peak-load pricing
If the fixed overhead allocated for actual output unit is $7500 and budgeted fixed overhead is $21000, then the production volume variance will be __________?
A $16,500
B $15,500
C $14,500
D $13,500
Correct Answer: $13,500
The systematic evaluation of value chain, to reduce costs and high quality, to achieve satisfied customers is known as __________?
A reverse engineering
B value engineering
C target engineering
D operation engineering
Correct Answer: value engineering
A cost, consists of some fixed and some variable cost with respect to machine setup hours is termed as _________?
A setup cost
B batch cost
C facility cost
D lump sum cost
Correct Answer: setup cost
An income, which a company aims to earn by selling each unit of market offering is classified as ____________?
A target operating income per unit
B target cost per unit
C total current full cost
D total cost per unit
Correct Answer: target operating income per unit
An unfavorable volume-production variance is used to measure the amount of __________?
A fixed setup cost
B total setup cost
C variable setup cost
D total overhead cost
Correct Answer: fixed setup cost
The kind of cost which on elimination, would not reduce the perceived usefulness that customers can obtain by using the market offering is known as ___________?
A designed-in costs
B locked-in costs
C value added cost
D non-value added cost
Correct Answer: value added cost
If an actual cost incurred is $627500, the flexible budget amount is $358750, then fixed overhead variance of flexible-budget will be _________?
A $218,750
B $238,750
C $258,750
D $268,750
Correct Answer: $268,750
The concept, which states that resources are used to meet particular goals is ____________?
A cost incurrence
B valued incurrence
C locked incurrence
D non valued incurrence
Correct Answer: cost incurrence
The process of ensuring preventive measure to be done in all machines is classified as _________?
A potential price response
B potential cost response
C potential budget response
D potential management response
Correct Answer: potential management response