The hierarchy which is based on different types of cost allocation and drivers, to categorize cost pool activity is classified as __________?
A cost hierarchy
B price hierarchy
C activity hierarchy
D purpose hierarchy
Correct Answer: cost hierarchy
The corporate sustaining costs and distribution channel costs are also classified as _________?
A indirect costs
B variable costs
C fixed costs
D direct costs
Correct Answer: fixed costs
The type of costs that cannot be traced for individual products but help in supporting an organization are classified as ___________?
A individual sustaining costs
B facility sustaining costs
C sustained tracing
D support tracing
Correct Answer: facility sustaining costs
If the sales volume variance is $8500 and the static budget amount is $2000, then the flexible budget amount would be ___________?
A $6,500
B $6,600
C $6,700
D $6,800
Correct Answer: $6,500
The cost pool category, which have the similar cause and effect relationship, with each cost driver uses as an allocation base is classified as __________?
A heterogeneous price pool
B homogenous cost pool
C heterogeneous cost pool
D homogenous price pool
Correct Answer: homogenous cost pool
If the static budget amount is $6200 and the flexible budget amount is $4500, then the sales volume variance will be __________?
A $6,200
B $1,700
C $17,000
D $4,500
Correct Answer: $1,700
In activity based costing system, the description of activity can be classified as __________?
A activity list
B activity dictionary
C active purpose
D both A and B
Correct Answer: both A and B
The difference between actual result and corresponding amount of flexible budget, on the basis of actual level of output is classified as __________?
A sales mix variance
B sales volume variance
C flexible budget variance
D static budget variance
Correct Answer: flexible budget variance
The costs of all the activities for a group of products, rather than individual product can be classified as ___________?
A activity level costs
B input level costs
C batch level costs
D output level costs
Correct Answer: batch level costs
In customer cost hierarchy, the cost of activities related to specific channel of distribution is classified as ___________?
A discretionary channel costs
B corporate-sustaining costs
C distribution-channel costs
D engineered resource costs
Correct Answer: distribution-channel costs