The value, which measures that how large is the value of standard error in relevance to value of estimated coefficient, is termed as __________?
A t-value
B b-value
C d-value
D c-value
Correct Answer: t-value
The formal way of differentiating, between non-random and random variations, in manufacturing process is classified as ____________?
A statistical process control
B statistical failure control
C statistical control of prevention cost
D statistical control of sunk cost
Correct Answer: statistical process control
The chances of cost to be considered as variable are more, if the __________?
A time horizons are long
B time horizons are short
C time horizons are irrelevant
D time horizons are relevant
Correct Answer: time horizons are long
If the manufacturing cycle efficiency is 0.725 and the total manufacturing time is 45 minute, then the value added manufacturing time will be _________?
A 42.625
B 36.724
C 32.625
D 41.625
Correct Answer: 32.625
An analysis of data over successive past periods, which pertain to some plant, activity and organization is called ___________?
A economic series
B financial series
C time series
D analytical series
Correct Answer: time series
The chart which represents how regularly the defect occurs in production process is classified as ___________?
A relevant costing diagram
B cause and effect diagram
C control chart
D Pareto chart
Correct Answer: Pareto chart
The residual term is also considered as __________?
A error term
B disturbance term
C relevant term
D both a and b
Correct Answer: both a and b
The delivery of goods by the time it is contracted to be delivered is known as ____________?
A effective performance
B efficient performance
C in-time performance
D on-time performance
Correct Answer: on-time performance
All the conditions or assumptions of regression analysis in simple regression can give __________?
A dependent estimation
B independent estimation
C reliable estimates
D unreliable estimates
Correct Answer: reliable estimates
The time a company takes until a good is produced after order placement is known as ___________?
A manufacturing lead time
B manufacturing cycle efficiency
C customer response time
D system process time
Correct Answer: manufacturing lead time