In a given scenario, if the cost is considered as indirect cost then independent variable will be considered as _________?
A demand allocation base
B supply allocation base
C cost allocation base
D price allocation base
Correct Answer: cost allocation base
If the cost of direct materials use in the goods sold is $5000 and the total revenues are $9000 then the throughput contribution would be ____________?
A $5,000
B $14,000
C $4,000
D $9,000
Correct Answer: $4,000
The third step in estimation of cost function, by using quantitative analysis is collection of data for ___________?
A cost and cost object
B price and cost driver
C dependent variable and cost driver
D independent variable and cost driver
Correct Answer: dependent variable and cost driver
The on-time performance and customer-response time are the examples of ___________?
A customer measures
B financial measures
C measures of growth and learning
D measures of internal business processes
Correct Answer: customer measures
In estimation of cost function, an example of independent variable is ___________?
A level of activity
B quantity stored
C quantity manufactured
D quality of product
Correct Answer: level of activity
The costs that are incurred to prevent low quality goods production are classified as ___________?
A costs of quality
B costs of learning
C costs of reengineering
D costs of spoilage inventory
Correct Answer: costs of quality
The formula of 1 – unexplained variation ⁄ total variation is used to calculate _____________?
A coefficient of determination
B coefficient of index
C coefficient of residual
D coefficient of prediction
Correct Answer: coefficient of determination
The total manufacturing time is multiplied to the manufacturing cycle efficiency to calculate __________?
A manufacturing cycle efficiency
B value added manufacturing time
C responding time
D delivery time
Correct Answer: value added manufacturing time
The cost that has elements of variable and fixed costs at the same time is __________?
A variable cost
B mixed cost
C semi variable cost
D Both B and C
Correct Answer: Both B and C
The graph which plots the series of successive observations of specific procedure, operation or step at regular time intervals is called ____________?
A relevant costing diagram
B cause and effect diagram
C control chart
D pareto diagram
Correct Answer: control chart