The capacity level of operations which is less than theoretical capacity is considered as ___________?
A practical capacity
B theoretical costing
C standard capacity
D actual capacity
Correct Answer: practical capacity
Tender is an_____________?
A estimation of profit.
B estimation of cost.
C estimation of selling price.
D estimation of units.
Correct Answer: estimation of selling price.
In Variable Costing Method, the fixed manufacturing cost in the calculation period is treated as _________?
A variable quantity
B fixed quantity
C price
D expense
Correct Answer: expense
Warehouse rent is a part of _________?
A prime cost.
B factory cost.
C distribution cost.
D production cost
Correct Answer: distribution cost.
The denominator of the fixed manufacturing cost rate is __________?
A adjusted labor utilization
B unadjusted labor utilization
C material utilization
D capacity utilization
Correct Answer: capacity utilization
The product capacity and costing, performance evaluation and regulatory requirements are the purposes of ___________?
A denominator level choices
B numerator level choices
C normal level choices
D standard level choices
Correct Answer: denominator level choices
An income statement in absorption costing follows the format of ___________?
A inventory margin
B sales margin
C Gross margin
D production margin
Correct Answer: Gross margin
In absorption costing, the contribution margin per unit, fixed operating and manufacturing costs are all the dependents of ___________?
A profit point
B breakeven point
C production point
D cost point
Correct Answer: breakeven point
The budgeted fixed manufacturing cost for per unit, which is used to measure per unit cost of supplying is called ___________?
A indirect labor
B capacity
C raw material
D direct labor
Correct Answer: capacity
An approach in which, the over allocated and under allocated is spread in, ending balance of finished goods control, is called ___________?
A allocation approach
B unadjusted approach
C proration approach
D adjusted approach
Correct Answer: proration approach