Management Sciences focuses on the planning, organizing, leading, and controlling of resources to achieve organizational goals.This subject is highly important for competitive exams, academic study, and professional careers in the business and public sectors.

The quantity of input which is carefully determined is called ___________?
A output unit
B input unit
C standard input
D standard output
Correct Answer: standard input
An estimated coefficient, which indicates the degree by which the estimated values are affected by random factors is known as ___________?
A standard error of estimated coefficient
B weighted error of estimated coefficient
C average of estimated coefficient
D variance of estimated coefficient
Correct Answer: standard error of estimated coefficient
In normal costing, the budgeted rate is multiplied to an actual quantity, which have been used as the allocation base to calculate ___________?
A budget overhead applied
B manufacturing overhead applied
C labor overhead applied
D none of above
Correct Answer: manufacturing overhead applied
The degree which predetermines target or income achieved, can be grouped under __________?
A growth evaluation
B performance evaluation
C efficiency
D effectiveness
Correct Answer: effectiveness
If the difference between costs linked to highest and lowest observation of cost driver is $36000 and observation of cost driver is 30 machine hours, then slope coefficient would be __________?
A $1,200
B $1,400
C $1,600
D $1,800
Correct Answer: $1,200
If the budgeted cost in indirect cost pool is $139600 and total quantity of cost allocation base is $155600, then the budgeted indirect cost rate would be __________?
A 69.72%
B 79.72%
C 99.75%
D 89.72%
Correct Answer: 89.72%
An actual input quantity is 200 units and the budgeted input quantity is 50 units, then the efficiency variance will be ___________?
A 275 units
B 250 units
C 150 units
D 650 units
Correct Answer: 150 units
The work measurement method of cost estimation is also called ___________?
A price engineering method
B industrial engineering method
C measuring engineering method
D unit engineering method
Correct Answer: industrial engineering method
If the budgeted indirect cost is $225 and the budgeted cost allocation base is $750 per hour, then the annual indirect cost (budgeted) would be __________?
A $168,750
B $148,570
C $186,750
D $125,680
Correct Answer: $168,750
If the flexible budget variance is $105000, the actual cost is $65000 then the flexible budget cost will be ___________?
A $40,000
B $50,000
C $150,000
D $170,000
Correct Answer: $40,000