Software Engineering MCQs for job test and interview preparation, especially for fresh graduates, students, and candidates appearing in competitive exams. These multiple-choice questions cover a wide range of topics, including the fundamentals of software engineering, its various types, advanced concepts, software design, development processes, testing methods, software evolution, and security aspects.

The Capability Maturity Model (CMM) is a continuous model ?
A True
B False
C
D
Correct Answer: False
What is not included in prevention costs ?
A quality planning
B formal technical reviews
C test equipment
D equipment calibration and maintenance
Correct Answer: equipment calibration and maintenance
The ISO 9000 series of standards is a program that can be used for external quality assurance purposes ?
A True
B False
C
D
Correct Answer: False
CO policy in CMM means___________________?
A The leadership practices in Commitment to Perform
B The organizational structure (groups) practices in Ability to Perform
C The policy practices in Commitment to Perform
D The planning practices in Commitment to Perform
Correct Answer: The policy practices in Commitment to Perform
Which of the following is not a maturity level in CMM ?
A Design
B Repeatable
C Managed
D Optimizing
Correct Answer: Managed
Which of the following requires design control measures, such as holding and recording design reviews and qualification tests ?
A CMM
B ISO 9001
C ISO 9000-3
D None of the mentioned
Correct Answer: ISO 9000-3
____________ states that, where appropriate, adequate statistical techniques are identified and used to verify the acceptability of process capability and product characteristics?
A ISO 9001
B ISO 9000-4
C CMM
D All of the mentioned
Correct Answer: ISO 9001
Which of the following is not a SQA plan for a project ?
A evaluations to be performed
B amount of technical work
C audits and reviews to be performed
D documents to be produced by the SQA group
Correct Answer: amount of technical work
The CMMI assessment is based on a x-point scale. What is the value of x ?
A 0
B 2
C 4
D 6
Correct Answer: 6
It is always best to start process analysis with a new test model ?
A True
B False
C
D
Correct Answer: False