Software Engineering MCQs for job test and interview preparation, especially for fresh graduates, students, and candidates appearing in competitive exams. These multiple-choice questions cover a wide range of topics, including the fundamentals of software engineering, its various types, advanced concepts, software design, development processes, testing methods, software evolution, and security aspects.

Which of the following is not a project manager’s activity ?
A project control
B project management
C project planning
D project design
Correct Answer: project design
Who delivers the technical skills that are necessary to engineer a product or an application ?
A Practitioners
B Project managers
C Senior managers
D None of the mentioned
Correct Answer: Practitioners
Which of the following is a people-intensive activity ?
A Problem solving
B Organization
C Motivation
D Project management
Correct Answer: Project management
Which software engineering team has no permanent leader ?
A Controlled decentralized (CD)
B Democratic decentralized (DD)
C Controlled Centralized (CC)
D None of the mentioned
Correct Answer: Democratic decentralized (DD)
SPMP stands for__________________?
A Software Project Manager’s Plan
B Software Project Management Plan
C Software Product Management Plan
D Software Product Manager’s Plan
Correct Answer: Software Project Management Plan
Which of the following is an activity that distributes estimated effort across the planned project duration by allocating the effort to specific software engineering tasks ?
A Software Macroscopic schedule
B Software Project scheduling
C Software Detailed schedule
D None of the mentioned
Correct Answer: Software Project scheduling
Which of the following is not a project factor that should be considered when planning the structure of software engineering teams ?
A The difficulty of the problem to be solved
B High frustration caused by personal, business, or technological factors that causes friction among team members
C The degree of sociability required for the project
D The rigidity of the delivery date
Correct Answer: The degree of sociability required for the project
Which type of software engineering team has a defined leader who coordinates specific tasks and secondary leaders that have responsibility for sub tasks ?
A Controlled decentralized (CD)
B Democratic decentralized (DD)
C Controlled centralized (CC)
D None of the mentioned
Correct Answer: Controlled decentralized (CD)
Who interacts with the software once it is released for production use ?
A End-users
B Client
C Project (technical) managers
D Senior managers
Correct Answer: End-users
Which of the following paradigm attempts to structure a team in a manner that achieves some of the controls associated with the closed paradigm but also much of the innovation that occurs when using the random paradigm ?
A asynchronous paradigm
B open paradigm
C closed paradigm
D synchronous paradigm
Correct Answer: open paradigm