Software Engineering MCQs for job test and interview preparation, especially for fresh graduates, students, and candidates appearing in competitive exams. These multiple-choice questions cover a wide range of topics, including the fundamentals of software engineering, its various types, advanced concepts, software design, development processes, testing methods, software evolution, and security aspects.

Which of the following is not a real-time architectural pattern _______________________ ?
A Observe and React
B Environmental Control
C Embedded System
D Process Pipeline
Correct Answer: Embedded System
The times by which stimuli must be processed and some response produced by the system is known as____________________?
A Compile time
B Frequency
C Deadlines
D Execution time
Correct Answer: Deadlines
The switch to backup power must be completed within a deadline of______________________?
A 50 ms
B 55 ms
C 70 ms
D 100 ms
Correct Answer: 50 ms
Which of the following is represented as an aspect that requests a login name and password ?
A Class
B Object
C User authentication
D All of the mentioned
Correct Answer: User authentication
A project usually has a timeline chart which was developed by_________________?
A Henry Gantt
B Barry Boehm
C Ivar Jacabson
D None of the mentioned
Correct Answer: Henry Gantt
What is a collection of software engineering work tasks, milestones, and deliverables that must be accomplished to complete a particular project ?
A Task set
B Degree of milestone
C Adaptation criteria
D All of the mentioned
Correct Answer: Task set
Every task that is scheduled should be assigned to a specific team member is termed as_________________?
A Compartmentalization
B Defined milestones
C Defined responsibilities
D Defined outcomes
Correct Answer: Defined responsibilities
Ensuring that no more than the allocated number of people are allocated at any given time in Software Scheduling is known as ________________?
A Time Allocation
B Effort Validation
C Defined Milestone
D Effort Distribution
Correct Answer: Effort Validation
What evaluates the risk associated with the technology to be implemented as part of project scope ?
A Concept scoping
B Preliminary concept planning
C Technology risk assessment
D Customer reaction to the concept
Correct Answer: Preliminary concept planning
Which of the following is a project scheduling method that can be applied to software development ?
A PERT
B CPM
C CMM
D Both PERT and CPM
Correct Answer: PERT