Software Engineering MCQs for job test and interview preparation, especially for fresh graduates, students, and candidates appearing in competitive exams. These multiple-choice questions cover a wide range of topics, including the fundamentals of software engineering, its various types, advanced concepts, software design, development processes, testing methods, software evolution, and security aspects.

Which of the following is not a maturity level in CMM ?
A Design
B Repeatable
C Managed
D Optimizing
Correct Answer: Managed
Which of the following requires design control measures, such as holding and recording design reviews and qualification tests ?
A CMM
B ISO 9001
C ISO 9000-3
D None of the mentioned
Correct Answer: ISO 9000-3
____________ states that, where appropriate, adequate statistical techniques are identified and used to verify the acceptability of process capability and product characteristics?
A ISO 9001
B ISO 9000-4
C CMM
D All of the mentioned
Correct Answer: ISO 9001
Which of the following is not a SQA plan for a project ?
A evaluations to be performed
B amount of technical work
C audits and reviews to be performed
D documents to be produced by the SQA group
Correct Answer: amount of technical work
The CMMI assessment is based on a x-point scale. What is the value of x ?
A 0
B 2
C 4
D 6
Correct Answer: 6
It is always best to start process analysis with a new test model ?
A True
B False
C
D
Correct Answer: False
Which of the following is not a part of process change ?
A Introducing new practices, methods or processes
B Introducing new team members to existing project
C Introducing or removing deliverable
D Introducing new roles or responsibilities
Correct Answer: Introducing new team members to existing project
What is a tangible output of an activity that is predicted in a project plan ?
A Deliverable
B Activity
C Condition
D Process
Correct Answer: Deliverable
Process improvement is the set of activities, methods, and transformations that developers use to develop and maintain information systems ?
A True
B False
C
D
Correct Answer: False
How many stages are there in process improvement ?
A three
B four
C five
D six
Correct Answer: three