M C Q s D r i v e

Software Engineering Mcqs 840 MCQs [All-Courses]

thumb

Software Engineering MCQs for job test and interview preparation, especially for fresh graduates, students, and candidates appearing in competitive exams. These multiple-choice questions cover a wide range of topics, including the fundamentals of software engineering, its various types, advanced concepts, software design, development processes, testing methods, software evolution, and security aspects.

What functionality of Requirement Management Tool (RMT) is depicted by the statement: “the tool should be able to automatically detect relations between artifacts. For example information retrieval techniques, monitoring of change history, naming schemas or model transformations________________________?
A Automatic Link Detection
B Documentation Support
C Graphical Representation
D Automatic Link Creation and Change
Correct Answer: Automatic Link Detection
Which of the following is a requirement management activity ?
A Investigation
B Design
C Construction and Test
D All of the mentioned
Correct Answer: All of the mentioned
According to a statistical report: “over 30% of all software projects are cancelled before completion and over 70% of the remainder fail to deliver expected features”. What must be the reason for such a situation ?
A Poor change management
B Poor requirements management
C Poor quality control
D All of the mentioned
Correct Answer: Poor requirements management
How many steps are involved in Feature Oriented Domain Analysis (FODA) ?
A Two
B Three
C Four
D Five
Correct Answer: Three
How is CORE different from IBIS ?
A Iterative in nature
B Redundancies are removed
C It is simple and an easier method to use
D Consistency problems are addressed in CORE
Correct Answer: Consistency problems are addressed in CORE
What is the major drawback of CORE ?
A Requirements are comprehensive
B NFRs are not given enough importance
C Role of analyst is passive
D All of the mentioned
Correct Answer: Role of analyst is passive
How many Scenarios are there in elicitation activities ?
A One
B Two
C Three
D Four
Correct Answer: Four
Why is Requirements Elicitation a difficult task ?
A Problem of scope
B Problem of understanding
C Problem of volatility
D All of the mentioned
Correct Answer: All of the mentioned
Which of the following property of SRS is depicted by the statement : “Conformity to a standard is maintained” ?
A Correct
B Complete
C Consistent
D Modifiable
Correct Answer: Complete
Consider the following Statement: “The data set will contain an end of file character.”What characteristic of SRS is being depicted here ?
A Consistent
B Non-verifiable
C Correct
D Ambiguous
Correct Answer: Non-verifiable